| |
| Complete plants and accessories for surfacce protection are designed and produced by internacional standars for WOOD, PLASTIC or METAL surface. We can build plants that satisfies your requirements for production rate, parts end use and dimmensions. |
| Horizontal
COMPACT system for powder coating on parts 8m
long: — Floor space needed is 10 x 22m (height 3.5m) — "Power & Free" conveyor is used with accumulation on load and unload section and in the oven. — Oven is much smaller and energy efficient. — Powder coating is done in automatic powder booth. — Picture shows plant with multi-cyclones and filter section for powder recycling. |
|
![]() |
![]() |
| Vertical
COMPACT system for powder
coating on parts 8m long:
— Floor space needed is 12 x 15m (height 5m). — Parts do not move in the load and unload section. — Tact overhead conveyor is used. — Oven is above loading section. — Powder coating is done by moveing the powder booth across the parts together with section for powder recycling. — Picture shows plant with filters in the floor of the powder booth. |
|
![]() |
![]() |
ECOENGINEERING D.O.O.
Dr Zoran Đinđić st. 4a,
34 000 Kragujevac, SCG
Tel: +381 (0)34 335 008, 335 669
Tel/fax: +381 (0)34 300 780
e-mail: office@ecoinzenjering.com
